Monorail MR+TR
Building maintenance unit (BMU) with rail and powered cradle.
Description
Features and benefits:
– TR01:
- Trolley manually operated by rope, chain and pulley.
- A single suspension system.
- Manufactured from stainless steel and aluminum alloy (EN AW 6063-T5).
- Working load limit (WLL): 400 kg.
- Three phase voltage: 50/60 Hz.
– TR02:
- Manufactured from stainless steel and aluminum alloy (EN AW 6063-T5).
- Working load limit (WLL): 800 kg.
- Approximate speed: 5 m/min.
- Ingress protection: IP55.
- Three phase voltage: 50/60 Hz.
- Traversing controls by pendant control box or on the suspended cradle.
Components:
- Powered cradle.
- Hoist.
- Pendant control.
- Suspension rope.
- Aluminum rail (MR).
- Cross bar and trolleys (TR).
Manufactured in accordance with the following regulations:
- European standard for machinery – 2006/42/EC.
- European standard safety requirements on suspended access equipment – EN 1808:2000+A1:2010.
- Safety of machinery (Electrical equipment of machines) – EN 60204-1.
- Specification and approval of welding procedures for metallic materials – EN-1 and EN-288-2.
- Quality management systems – ISO 9001:2000.
- Declaration of conformity – 2006/42/EC.
- CE marked and UL certified.
General information
Uniclass 2015 |
Ss_80_30_25_50 Mobile rig monorail suspended access systems |
CAWS |
N25/110 Permanent suspended access system |
Specification data – Mobile rig monorail suspended access systems
Product Reference |
Monorail TR01
Working load limit: 400 kg. Monorail TR02 Working load limit: 800 kg. |
Standard Product Features |
Nominal load:
Curve radius: ≥ 600 mm. Maximum span between brackets: 3000 mm. Electrical components: Uses main European brands (Nord, Schneider, Telemecanique, etc). |